What Makes a CCTV Drainage Survey Acceptable for Adoption

How CCTV survey reporting should be coded, presented and evidenced so a water authority accepts it for Section 104 sewer adoption without query.

Not all surveys are adoption-grade

A CCTV survey that is fine for a maintenance report is often rejected for adoption. Water authorities expect fully coded reporting, clean and flooded-free footage, proven access to every manhole, and defect grading that matches the industry coding standard rather than free-text notes.

What we include as standard

An adoption-ready survey pack should contain:

  • HD footage of every run, upstream and downstream where required
  • Coded defect reporting with location references and severity grading
  • Manhole inspection records including benching, channels and cover detail
  • Photographic evidence of each chamber
  • A prioritised recommendations schedule with repair method
  • Drawings marked up against the as-built layout

Survey before the trades leave site

Surveying while groundworks are still mobilised is far cheaper than returning months later. If a defect is found, the plant and the labour to fix it are already on site, and the re-survey can be done in the same visit.